Project Alternatives

  • Alternative 1

    Expansion to south and east.

    Footprint increased by 6.72 ha.

    Relocation of on-site buildings.

    Relocation of one pond.

  • Alternative 2

    Expansion to north and east.

    Includes 0.375 m height increase.

    Footprint increased by 6.4 ha.

    No disruption of on-site infrastructure.

    Relocation of three ponds.

  • Alternative 3

    Expansion to the east.

    1 m height increase over small portion.

    Footprint increased by 5.12 ha.

    No disruption of on-site infrastructure.

    Relocation of one pond.